
Signed contract to complete design in 2 days.
With LGCY Express Lane you run the site survey yourself, on the same visit. Design can start the day you sign, and your customer sees a final design while the deal is still warm.




How fast it moves
Your site survey happens before you leave the house.
Same day
Signed contract to design
2 days
Signed contract to complete design
15 to 20 min
To capture the site survey in Pitch
From the field
I signed it on Monday, I went back Tuesday. A day and a half later I had a final design to show a customer.
This is going to become the standard.
Tyler Anderson
LGCY rep. Complete design within 2 days of signed contract.
How it works
One visit. No surveyor trip. A final design in 2 days.
01
Sign the contract
Close the deal at the table like you always do.
02
Capture the site survey
Take the photos and details in Pitch before you leave. It takes 15 to 20 minutes.
03
Design starts
No waiting on a surveyor. Design can start the same day you sign.
04
Show the final design
Go back with a complete design within 2 days, while your customer is still excited.
Which jobs qualify
Most newer homes run the Express Lane.
You run the survey
- Newer homes
- Straightforward electrical
- Panel and meter you can reach
A surveyor runs it
- Homes 20 years or older
- Jobs where you can't capture everything required
Either way, nothing moves to NTP until the photos come in.
Talk to a recruiter.
Tell us where you want to sell. A recruiter in your market will reach out.
